Red5Sorcery / Data Sculptor

WASM-002 adversarial QA review — Revision BM Day 060 H-30 final focused re-check

Independent re-check of the ten findings left open by the H-20 focused re-check, with regression checks on the ten findings H-20 closed. Wednesday 7 October 2026. Findings only; no requirement text, fixture or supporting record has been changed.

Review identity

PacketClaude_Recheck_H30.zip, SHA-256 A486D29018A7B92F7E81BB99BDA3444C5E7431272483932C84CEF8E564E5CF89 (computed on receipt; no external hash was supplied). All 23 entries in SHA256_MANIFEST.txt verify, and every file is listed. The packaged README is byte-identical to the one sent separately.
Full masterRed5Sorcery_Data_Sculptor_Product_Backlog_PRD_Revision_BM_Day060_H30.html, SHA-256 B8D5BFAF736869513FD63EDBB082CB3C1FB7A6A1C2DA6915FCC8FF5CDF35D064
Focused cutRed5Sorcery_Data_Sculptor_WASM002_Focused_Review_Cut_Revision_BM_Day060_H30.html, SHA-256 946C3A16B3AD1CB450312EC253CF488AFE5D071743A0B4F7D182A35B3D2D72EB
Fixture corpusWASM002_Day060_H29_Replacement_Fixture_Corpus.zip, SHA-256 618803BFEF07DCC1087BE5119F4FC57372679E96D4218D020F1F2E037DD287F5. All 79 internal manifest entries verify, and every file is listed.
TraceabilityPass 1 refresh E43C201D…EBFF8E8 and carried-item disposition 0491B68F…7FF1E1F3, matching the H-30 audit.
Source reviewMy H-20 focused re-check D710139D…E99D0EB and its sidecar 10F45A6A…EAC398, both byte-identical to the copies I issued.

Wording boundary. A positive gate means only that I find no remaining integration defect that should prevent T from deciding to freeze. It does not freeze WASM-002, approve requirements or authorize implementation; T retains acceptance authority.

1. Summary

10CLOSEDN-01, BM-11, BM-06, BM-08, BM-04, BM-09, N-02, N-03, N-04, BM-05. The only blocker (N-01) and all five material residuals are closed.
0RESIDUALNone of the ten remains open.
3NEW · CLARITYH-21 to H-30 introduced three small wording gaps (C-01 to C-03). None changes behavior, none can produce divergent bytes against the golden corpus, and each is a one-sentence edit.
0REGRESSIONSNone of the ten findings closed at H-20 has reopened.

2. The ten re-checked findings

N-01H-20: BLOCKINGCLOSED

W002-UI-ACC-019 now tests the F-01 architecture

BM-11H-20: MATERIALCLOSED

The CONVERT undefined-byte golden Receipt is now reachable

BM-06H-20: MATERIALCLOSED

The Inventory review Suitcase is now reachable and fully packaged

BM-08H-20: MATERIALCLOSED

The MATERIALIZE publication row is split by successor-MAP stage, with a fixture for each side

BM-04H-20: MATERIALCLOSED

The already-valid-UTF-8 CONVERT refusal is frozen and fixtured

BM-09H-20: MATERIALCLOSED

The repairable-DEGRADED routing refusal has its own diagnostic

N-02H-20: CLARITYCLOSED

Stale routing and recovery-evidence wording is corrected

N-03H-20: CLARITYCLOSED

The pinned-diagnostics JSON is canonical

N-04H-20: CLARITYCLOSED

DS-UTC-001 declares its MAP profile

BM-05H-20: CLARITYCLOSED

Traceability is refreshed against H-29

3. New findings introduced by H-21 to H-30

C-01NEW · CLARITY

The H-12 table preamble still says every row has next_action NONE

BM: W002-HELP-001.8 · Introduced by H-26

Direction. Change the preamble to "next_action: NONE except DS-MAT-017, whose next_action is RUN_REPAIR_MAP".

C-02NEW · CLARITY

"Successfully published" has two readings after rollback

BM: W002-RCP-006W002-RCP-007W002-MAT-002.7 · Fixture: REFUSED__MATERIALIZE__MAP_PUBLICATION_STAGE.txt · Introduced by H-24

Direction. Add one sentence to W002-RCP-006: the created-artifact list contains only artifacts that remain committed governed artifacts when the Run finishes, so artifacts promoted and then rolled back (or left as non-authoritative residue) under All-or-Refuse are excluded. Also add to W002-RCP-007: with RID_ACTION: CREATED, RID_FILENAME records the RID identity promoted during the Run even if that RID was later rolled back.

C-03NEW · CLARITY

The DS-UTC-001 acceptance lines omit map_profile

BM: W002-WKO-ACC-004W002-WKO-ACC-005 · Introduced by H-29

Direction. Add map_profile: WKO to W002-WKO-ACC-004 and map_profile: STORE to W002-WKO-ACC-005.

4. Independent verification

5. Gate conclusion

READY FOR WASM-002 PRD FREEZE

All sixteen H-04 findings and N-01 to N-04 are closed against H-30 and the H-29 corpus. I find no blocking or material integration defect, and no regression.

Recommended with the freeze edit. C-01 to C-03 are clarity-only and don't affect the gate. Each is a one-sentence change to W002-HELP-001.8, W002-RCP-006/007 and W002-WKO-ACC-004/005, and none alters a golden byte. If T applies them before freezing, the frozen master's hash will differ from H-30. In that case a mechanical audit showing that only those requirements changed is sufficient; no further adversarial pass is needed. T may also freeze H-30 as is and carry C-01 to C-03 as tracked errata.